Description
This stunning just under one acre lot backing to open space with Gorgeous Red Rock Formations is just waiting for its future owners. Lots of mature trees including Spruce, Ponderosa Pines and Scrub Oak. Only 1 block from existing paved roads and utilities. The gently sloping lot is only waiting for the paved road and the installation of utilities to be able to make it the perfect buildable location. Area utilities include public water and sewer, natural gas, electric, phone lines and high-speed internet. The paved roads in the subdivision are county owned, maintained and plowed. Plot map is shown on pictures. Plenty of wildlife and plenty of beauty to call your own! The land can not currently be built on but the ballot initiative to approve debt related to the 2023 Bannock Drive LID was approved by the voters in the LID on November 5, 2024. Once financing is confirmed, preliminary design is scheduled to begin on the project with a target completion date of June 2025. Final design is scheduled for completion in December 2025 and bids for construction will be obtained in early 2026. Construction is expected to begin in 2026 and be complete in 2027.
-
0BEDS
-
0.88ACRES
-
0BATHS
-
01/2 BATHS
Offered by eXp Realty, LLC.Description
This stunning just under one acre lot backing to open space with Gorgeous Red Rock Formations is just waiting for its future owners. Lots of mature trees including Spruce, Ponderosa Pines and Scrub Oak. Only 1 block from existing paved roads and utilities. The gently sloping lot is only waiting for the paved road and the installation of utilities to be able to make it the perfect buildable location. Area utilities include public water and sewer, natural gas, electric, phone lines and high-speed internet. The paved roads in the subdivision are county owned, maintained and plowed. Plot map is shown on pictures. Plenty of wildlife and plenty of beauty to call your own! The land can not currently be built on but the ballot initiative to approve debt related to the 2023 Bannock Drive LID was approved by the voters in the LID on November 5, 2024. Once financing is confirmed, preliminary design is scheduled to begin on the project with a target completion date of June 2025. Final design is scheduled for completion in December 2025 and bids for construction will be obtained in early 2026. Construction is expected to begin in 2026 and be complete in 2027.
Based on information submitted to the MLS GRID as of 2025-11-10T17:22:59.087 (date and time MLS Grid Data was obtained). All data is obtained from various sources and may not have been verified by broker or MLS GRID. Supplied Open House information is subject to change without notice. All information should be independently reviewed and verified for accuracy. Properties may or may not be listed by the office/agent presenting the information.
© 2025 METROLIST, INC., DBA RECOLORADO® – All Rights Reserved
6455 S. Yosemite St., Suite 500
Greenwood Village, CO 80111 USA